Monday, November 21, 2011

Condor Blanco Mines Ltd.:. Holes in the gold-iron-copper project, encounter

Sydney, Australia 22 August 2011 Condor Blanco Mines Ltd.

Condor Blanco Mines Ltd.. / Key word (s): drilling results Condor
Blanco Mines Ltd.:. Holes in the gold-iron-copper project, encounter

Sydney, Australia. 22nd August 2011. Condor Blanco Mines Ltd.. (TSX:
A1H4KP ASX: CDB) announced today that it has begun drilling in the
backwash of 3,400 meters of drilling on the extent gold Iron Project,
located 40 km east of Copiapo in northern Chile. The holes are from 4
August performed. Until now, two wells were completed and two more are
currently being drilled. Currently, two drill rigs operating. The aim
of this first exploratory drilling is to find out whether the porphyry
system beneath the houses worthless clay and phyllites of the surface
ore.

Both wells have encountered long sections with distributed chalcopyrite ore:

Hole depth drill section (length in m) type of ore (m) (depth in m)

RCGI01 322 75-202127 241-322 81 chalcopyrite chalcopyrite

RCGI02 358 91-101 6 chalcopyrite chalcopyrite 160-183 23 282-358 76 chalcopyrite

There are a total of nine holes planned to a depth of 400 m (see
Figure 1 of the original British press release, which is linked at the
end). Hard rock, high water intake and prevented the first two holes
have reached the planned depth. However, the drilling showed that the
mineralized porphyry system over long sections. Samples have been sent
to the laboratory. The analytical results are expected.

Condor Mines has identified a large porphyry gold system on Iron and
mapped. The system comes to the surface and shows a striking color
anomaly in an area of ​​1.2 km by 600 m (Figure 2 of the original
English press release).

The porphyry system is embedded in monzonite porphyry and rocks, which
probably dates from the era of the Paleocene-Eocene, and lies near the
eastern border of the Chilean iron belt. This system is dominated by
quartz-sericite. The system is intruded by numerous
quartz-tourmaline-Brekkzien of lithic Brekkzien phreatic and
late-Brekkzien (see Figure 3). Low-copper mineralization occurs as a
secondary copper mineralization in quartz veins in late laminated
(Figure 4).

The limitations of this system have been tested by Anglo American in
the late 1980s by drilling. Data on the results of this drilling are
not available. However, only the surface and the holes were too far
away from the main system as that of a potential copper mineralization
could be tested effectively. , The replacement of the surface Argille
and quartz-sericite-weathering suggests that any mineralization - if
any - should occur at depth. The drilling of Condor Mines are
designed. Figure 3 shows the mapped geology and locations of proposed
drilling.

The first two holes have shown that the concept of exploration Condor
Gold Mines is right on Iron insofar as that the worthless rock surface
passes into mineralized rock from a depth of 80 meters. With
increasing depth of weathering is increasingly pottasisch, with
secondary biotite and Pottasium-feldspar are dominant. With increasing
depth of the content of magnetite.

Glen Darby, managing director of Condor Mines was in the supervision
of the hole RCGI02 to (see Figure 5). He commented on the progress,
after the first hole was completed successfully: 'We are delighted
with the results and the fact that the team is able to set goals and
achieve them. We were always convinced that this is a promising system
is available. The wells now supply the proof. '

The success of the first two holes is particularly encouraging because
they were drilled on the borders of the porphyry system. The holes are
gradually introduced to the inferred center of the system. The team of
Condor Mines is of the results on gold Iron excited because it had
success with the first wells in the first early-stage project in
Chile. The Company is not only on the results of the other holes on
gold Iron, but also to the commencement of drilling on the epithermal
gold-silver projects Carachapampa and La Isla and the large porphyry
system on the Yaretas project in the summer.

Friday, September 9, 2011

DAB bank KORDOBA and FIS agree the introduction of the core banking system

DAB bank KORDOBA and FIS agree the introduction of the core banking system, K-CORE24
IT, New Media & Software
Press release from: FIS KORDOBA
PR Agency: Interface Factors
Load data from Twitter
Load data from Facebook
Klaus-Peter White, Head of IT, DAB bank AG
Klaus-Peter White, Head of IT, DAB bank AG
View this image in big size
The DAB bank is in terms of changing market and compliance requirements on the mortgage banking system of K-CORE24 FIS KORDOBA

Munich, 02 September 2011 - The DAB bank, Germany's direct investment specialist for the Bank, and FIS KORDOBA, a leading software and services firm for the European banking market agree that the introduction of core banking system, K-CORE24. Crucial to the decision of the DAB bank is the strong position of FIS KORDOBA in the German banking market and the technological expertise to take the initiative to change in compliance, regulatory, and business plan banking needs speedily. K-CORE24 in 2012 to go into production, replacing the previous system.


Main subject of the contractual agreement is the implementation of K-CORE24 at DAB bank's core banking system of FIS KORDOBA includes the modules current account, fixed deposit, savings, payments, foreign currency and bank management, and cross-cutting functions. Among the services provided by FIS KORDOBA as part of the implementation, including consulting, development and customization, setting up a coordinated and comprehensive evaluation of test runs and the migration of incoming customer and bank data into the new system. At the same time K-CORE24 to relevant applications, eg tethered in the fields of business transaction and inventory management with interfaces and integrates into the existing system landscape.
Click here to find out more!


"FIS KORDOBA has a broad customer base and the successful K-standard software CORE24 firmly anchored in the German banking market. The long-term commitment of our partner's solution to users to proactively adapt the core banking system at national and European regulations and compliance requirements to individual permanently secure. For us this means the future security and investment venture capital, "said Klaus-Peter White, Head of IT, DAB bank AG:" There is also for us strategically integrate the option, future, additional modules and solutions of FIS KORDOBA seamlessly into the core banking system. "

"We are pleased with DAB bank not only on solution level, but also with our position in the market and as a company to convince them that ensures the long-term commitment to innovation, development and maintenance of systems is a long-term customer satisfaction," commented FIS KORDOBA CEO Margit Cabolet the signing ceremony.

This press release was published on openPR.


Fidelity Information Services
KORDOBA
Petra Boker
Barthstr. 18
80339 Munich
Tel: + 49 89 66065-445


PR agency
FACTORS INTERFACE GmbH
Dr. Ralph Klöwer
Landshuterallee 12
80637 Munich
Tel: + 49 89 552688-66


DAB bank AG
Dr. Jürgen Eikenbusch
Head of Corporate Communications
Landsberger Straße 300
80687 Munich
Tel: +49 (0) 89 500 68 595

Fidelity National Information Services, Inc. (NYSE: FIS)
FIS provides payment and banking systems worldwide for more than 14,000 financial service providers in over 100 countries. The solutions include core processes for banks and services around the issue of customer, debit and credit cards. FIS will also take over the handling of money transfers, etc. through the banking network NYCE ® (New York Cash Exchange). FIS is the Standard & Poor's (S & P) 500 ® Index and listed in the FinTech 100 ranking achieved a leadership position every year. FIS is headquartered 5 star hotels in Jacksonville, Florida and employs more than 30,000 employees worldwide. With the ticker symbol "FIS" is Fidelity National Information Services, Inc. trades on the New York Stock Exchange. For more information, please visit the FIS .

Fidelity Information Services KORDOBA (FIS KORDOBA)
FIS KORDOBA is a leading provider of software products and services for the European banking market. The company provides solutions in the areas of core banking, securities business, sales banking, bank management and authorization / self-power operation. FIS KORDOBA customers receive the high quality standard software products over the customization and implementation to various outsourcing models, care and maintenance "everything under one roof". FIS KORDOBA, with headquarters in Munich, employs more than 300 employees and is a 100% subsidiary of Fidelity National Information Services, Inc. For more information, see

DAB bank AG
The DAB bank () is specialized as a direct bank on the securities market and in Germany as well - direktanlage.at through its subsidiary - operates in Austria. Your offer is aimed at investors, traders and portfolio managers. At 30 June 2011, DAB bank administered the Group 621 128 depots with a total client assets of 27.08 billion €. DAB bank with headquarters in Munich, was founded in 1994 as the first discount broker in Germany.

Monday, August 9, 2010

copper metals in chemical processing

The processing of of the more volatile alcohol too. However, the primary effect will be to increase the percentage of alcohol in the vodka. This is good. The
secondary effect is to reduce the vodka production. This is bad. We would like to keep our product on spec (100 proof vodka) and also not lose production. To overcome this problem, we must first increase the heat input to the big can. To prevent the extra water vapor from diluting the vodka in the bottle, we must also increase the heat removed from the No. 1 coil. This is done by adding an additional length of coiled copper tubing to the No. 1 coil. As a consequence of adding more heat to the big can, and also removing more heat from the No. 1 coil, more liquid will drain out of the 12-oz can, back to the big can. This liquid is called reflux. This reflux is revaporized in the big can and circulates back and forth between the big can and the 12-oz can. This recirculation helps to separate the lighter, more volatile alcohol from the heavier, less volatile water.
There are several ways to describe what is happening. As a chemical engineer, I would say that we are increasing the internal
reflux ratio of the still. But what I would rather say is that we are making the still work harder. Harder in the sense that we are increasing
both the reboiler heat duty and the condenser heat removal duty. By the reboiler duty, I mean to say the amount of firewood burning under the still. By the condenser heat removal duty, I mean the amount of heat radiating away to the air from the No. 1 condensing coil.


Monday, June 28, 2010

copper ore brokers

If you have copper for sale, please make contact with copper brokers in South Africa. Buyers of copper are naturally welcome us well.

Sunday, February 28, 2010

Open-pit copper mining methods

Open-pit copper mining methods and practices at the Chino Mines Division, Kennecott Copper Corp., Grant County, N. Mex.
A former large-output surface Cu-Ag-Au-Mo-Zn-Ti-Nb-Rb-Gemstones mine located in the SE ¼ sec. 22, SW ¼ sec. 23, NW ¼ sec. 26 & the NE ¼ sec. 27, T. 12S., R.6W., about ½ mile (0.8 km) South of Ajo. Discovered by the Spaniards in 1750. First produced in modern times in 1917. Owned at times, or in part, by the Arizona Copper Mining & Trading Co.; St. Louis Copper Co.; the Rescue Copper Co.; Cornelia Copper Co.; New Cornelia Copper Co. (1912-1916); Calumet & Arizona Copper Co.; and the New Cornelia Division, Phelps Dodge Corp.



Mineralization is an elliptical ore body 2,011.63 meters long, 1,206.98 meters wide, 487.68 meters deep, and 304.8 meters thick, with veinlets and disseminations of chalcopyrite, bornite, and minor pyrite, oxidized in the upper part to carbonates, silicates, and minor chalcocite, deposited in fractured and faulted, altered Laramide quartz monzonite and bordering quartz diorite facies, and often in close association with irregular pegmatite zones in the intrusive.

Monday, February 1, 2010

Potassic Igneous Rocks and Associated Gold-Copper Mineralization

We would be looking to a good book review on the following book with the title:
Potassic Igneous Rocks and Associated Gold-Copper Mineralization

Friday, December 5, 2008

sell copper cathodes

There are copper cathodes from Zambia for sale. 200 metric tons per month are available immediately and the capacity can still be increased later. If you are interested into purchasing copper cathodes, please make contact at sell copper cathodes.